The roof is the part of the building protecting everything else.

A roof is the one system where a small failure quietly becomes an expensive one. Water that gets past the envelope does not announce itself — it shows up months later as a stain on a ceiling, and by then the sheathing has been wet for a while.

Our roofing work is done with the same attention as our framing, because we understand what is underneath: the sheathing, the structure, and what happens to both when the details are wrong. Underlayment, flashing, and ventilation get done properly rather than covered up.

We handle full reroofs on existing homes and roofing on new construction. Whether a roof needs replacing or just needs attention is worth assessing before committing to either.

What we take on.

Reroofing

Full tear-off and replacement on existing homes, including any sheathing that needs replacing.

  • Full tear-off and replacement
  • Sheathing repair and replacement
  • Underlayment and ice protection
  • Flashing and ventilation

New Construction

Roofing on new builds, additions, and garages — coordinated with the rest of the build.

  • New build roofing
  • Addition and garage roofing
  • Coordinated with framing stage
  • Weather protection during build

Repairs & Inspection

Assessing what you actually have before recommending what it needs.

  • Leak investigation
  • Localized repairs
  • Roof condition assessment
  • Storm damage review
View roofing View roofing View roofing

Roofing questions we hear most.

How do I know if my roof needs replacing?

Age, curling or missing shingles, granule loss, and any sign of water inside are the usual indicators. An in-person look is the only reliable way to tell whether a roof is near the end of its life or still has years left in it.

Do you work with insurance claims?

Hail and storm damage claims are common in this area. Damage assessment and documentation are part of that process, though the claim itself stays between you and your insurer.

What time of year should a roof be done?

Shingles seal best in warmer weather, so late spring through fall is ideal. Emergency work happens whenever it needs to.

Not sure whether your roof needs replacing?

Get in touch and we can talk through what you're seeing.

Get in Touch